Details: <p>Testing:</p><p>- In a project, create a cable, and then a cable within that cable.</p><p>- Insert a cable indicator whilw SHIFT is pressed, and select the sub-cable.</p><p>- Update cabling.</p><p>- If the wire color show at the junctions of connections and cable indicator, we're good.</p>